Shipment Overview
Delivery Location:
Shotton Mill
Freight Modes:
Heavy Lift Road Transport | Project Cargo
Cargo:
147.6Te Yankee Dryer
Specialist Equipment:
16 Axle Girder Frame Trailer
Project Type:
Heavy Lift Industrial Cargo Delivery and Site Positioning
The Challenge
The project involved the specialist transport, unloading, and final positioning of a 147.6Te Yankee Dryer at Shotton Mill.
Due to the cargo dimensions and weight, the operation required detailed engineering planning, specialist lifting coordination, and controlled site delivery procedures to ensure the cargo could be transported and positioned safely.
The project also required careful coordination between transport operations, crane lifting procedures, and final cargo positioning at site.
The Solution
DC Global Freight coordinated the unloading operation, crane management, and final transport delivery to Shotton Mill using specialist heavy lift transport equipment.
A 16 axle girder frame trailer was utilised to safely transport the cargo while detailed engineering planning ensured the unloading and positioning operations could be completed efficiently and safely.
The operation involved close coordination between lifting teams, transport specialists, and site personnel throughout the delivery process.