01_HERO_Night_Convoy

Yankee Dryer Heavy Lift

Shipment Overview

Delivery Location:
Shotton Mill

Freight Modes:
Heavy Lift Road Transport | Project Cargo

Cargo:
147.6Te Yankee Dryer

Specialist Equipment:
16 Axle Girder Frame Trailer

Project Type:
Heavy Lift Industrial Cargo Delivery and Site Positioning

The Challenge

The project involved the specialist transport, unloading, and final positioning of a 147.6Te Yankee Dryer at Shotton Mill.

Due to the cargo dimensions and weight, the operation required detailed engineering planning, specialist lifting coordination, and controlled site delivery procedures to ensure the cargo could be transported and positioned safely.

The project also required careful coordination between transport operations, crane lifting procedures, and final cargo positioning at site.

The Solution

DC Global Freight coordinated the unloading operation, crane management, and final transport delivery to Shotton Mill using specialist heavy lift transport equipment.

A 16 axle girder frame trailer was utilised to safely transport the cargo while detailed engineering planning ensured the unloading and positioning operations could be completed efficiently and safely.

The operation involved close coordination between lifting teams, transport specialists, and site personnel throughout the delivery process.

Tags: No tags